AIR & HYDRONIC SYSTEM TESTING & BALANCING
The first three and possibly most important steps to ensure that the building’s heating, air conditioning, and environmental control systems are designed, installed, and operating to maximum potential. The intent is to increase occupant comfort levels, increase mechanical systems efficiency, and even increase building safety by systems associated with ventilation equipment.
The Testing, Adjusting, & Balancing process contains two main facets, both typically based on design requirements; Air, and Water balancing. Both facets can be completed not only on new construction design but also existing systems.
By utilizing the expertise of our fully trained and qualified Testing, Adjusting, & Balancing Technicians we can also provide an in-depth system survey and analysis to discover existing building conditions and provide recommendations to improve overall building operations.
The Testing, Adjusting, & Balancing process contains two main facets, both typically based on design requirements; Air, and Water balancing. Both facets can be completed not only on new construction design but also existing systems.
By utilizing the expertise of our fully trained and qualified Testing, Adjusting, & Balancing Technicians we can also provide an in-depth system survey and analysis to discover existing building conditions and provide recommendations to improve overall building operations.
IN HOUSE & ON-SITE
Servicing customers in every way possible to ensure a seamless transition from design to system handover.
REVIEW CONTRACT DOCUMENTS & DESIGN
|
DEVELOP SEQUENCE AND PROCEDURES |
BALANCING REPORT |
Understanding the expectations and requirements for the system to be installed.
|
Complete and comprehensive plan that outlines project specific test procedures and deliverables.
|
Final document summarizing the handover state of the system.
|
NEW CONSTRUCTION BALANCING |
EXISTING SYSTEM COMFORT BALANCING |
SYSTEM SURVEY & ANALYSIS |
Conventional tried and true balancing based on project design requirements.
|
Apply our years of experience, knowledge, and engineering background.
|
In depth impartial analysis of systems operating points, control devices, and current condition.
|
ISSUES LOG |
FUMEHOOD TESTING |
FIRE DAMPER TESTING & VERIFICATION |
Live document created by us to be utilized by the construction team to document and rectify any deficiencies encountered.
|
Test, adjust, and document performance to ensure devices compliance with local regulations.
|
Physical drop testing of new and existing fire dampers to ensure code compliant operation.
|