AIR & HYDRONIC SYSTEM COMMISSIONING

The best practised method to ensure that the building’s heating, air conditioning, and environmental control systems are designed, installed, and operating to maximum potential. The intent of commissioning is to avoid increased O&M costs, reduce occupant discomfort, and to avoid the loss of product and productivity associated with ventilating equipment and systems.

The commissioning process can be broken down into four categories: New Construction Commissioning – commissioning of new buildings; Retro Commissioning – commissioning of existing building systems; Retrofit Commissioning – Commissioning of retrofitted existing building systems; Recommissioning – commissioning of any building system that has been previously commissioned.


IN-HOUSE & ON-SITE

Servicing customers in every way possible to ensure a seamless transition from design to system handover.

REVIEW BASIS OF CONSTRUCTION DESIGN

DEVELOP & IMPLEMENT A Cx PLAN

STATIC & OPERATIONAL VERIFICATION

Understanding the expectations and requirements for the system to be installed.
 

  • System needs
  • Equipment selection
  • Control strategy
  • Safety protection system
Complete and comprehensive plan that outlines the tasks executed including schedule and proper chain of command.


  • Mechanical coordination schedule
  • Meetings to verify installation process
  • Confirm testing procedures
Physical high level end-to-end checks to ensure installation and operation meet design intent.
 

  • Unit components
  • Contractor services
  • Startup components
  • Continuous operation

MANUFACTURERS STARTUP VERIFICATION

FUNCTIONAL PERFORMANCE TESTING

FIELD REVIEW

Witness and document start-up procedures of any major equipment.


  • Specific system notes
  • Confirm equipment is operating per design documentation
  • Log any discrepancies or issues encountered
An in-depth analysis of the building management system (BMS) and its operation.

  • Identification
  • Equipment alarms
  • Control points
  • System fail-safes and redundancies
Site walk through investigating and documenting the installation process and progress.
 
  • Equipment accessibility
  • Control devices
  • Proper installation
  • Equipment identification

ISSUES LOG

OWNERS DEMONSTRATION

COMMISSIONING CERTIFICATE

Live document created by us to be utilized by the construction team to document and rectify any deficiencies encountered.


  • Deficiencies encountered
  • Action required for rectification
  • Trade required to rectify
Scheduled on site meeting with equipment suppliers to facilitate proper introduction of equipment and systems to owners.
 
  • Equipment identification
  • Overview of system
  • Maintenance requirements
Final document summarizing the handover state of the system.
 


  • Remaining deficiencies noted, if any
  • Summery of report
  • Signed certification
Picture
Copyright 2023  Raincity Technical Services Ltd.
PO Box 19019 RPO Rocky Point, Port Moody, BC  V3H 0J1
All rights reserved

  • Home
  • Services
    • Balancing
    • Commissioning
    • Manuals
    • Survey & Assessment
  • The Team
  • Contact